Synchronization & Excitation Control

Project NameScope of Work DetailsClientEnd UserYear
Excitation System SWCC Al-KhobarExecution FAT, Installation and commissioning of panels, PSS®E – Tuning Study @ Excitation System SWCC Al-KhobarABBSWCC Al Khobar2022
Commissioning & Training on ABB UNITROL 6080 AVR EXCITATION CONTROLCommissioning & Training on ABB UNITROL 6080 AVR EXCITATION CONTROLABBARAMCO2022
Upgrade of Qty:2 DG control panelDesign, Supply, Installation & Commissioning of Qty:2 generator control panels including Protection, AVR Excitation Control, Synchronization control, Gen Set control & Qty:1 PLC PanelEPGC / SAECO REZAYATSEC JUBA2021
Replacement of ABB Synchronization ControlSupply, Installation & Commissioning of ABB SYNCHROTACT 5 deviceSAECO REZAYATSEC MAKKAH2021
Installation and Commissioning Digital Excitation Systems DIGITAL EXCITATION SYSTEM, MANUFACTURER: BASLER, COMPLETE REGULATION SYSTEM W/ HARTING CONNECTORS, ( USED FOR
SIEMENS GENERATOR.
YCC | Yanbu Cement CompanyYCC | Yanbu Cement Company2020
ABB SYNCHROTACT 5 IEC61850 Integration ServiceIEC61850 Configuration for SYNCHROTACT 5ABBMARAFIQ YANBU2019
Gen#4 Control Panel RetrofitPanel Retrofit (PLC Migration from Siemens S5 to Allen-Bradley ControlLogix / Upgrade of Woodword Synchronizer / Upgrade of Woodword Speed control module / Upgrade of Gen. Set Controller / Replacement of Existing AEG 2000A ACB with ABB ACB / Engineering, design, programming, Installation & Commissioning)SCMC | Southern Cans Manuf.SCMC | Southern Cans Manuf.2016
Design, Supply & Commissioning of Synchronization Panel using ABB Controller SYNCHROTACT 5Design, Supply & Commissioning of Synchronization. Panel using ABB Controller SYNCHROTACT 5MSCL | Marine Services Co. Ltd.SWCC Jeddah2016
Design, engineering, supply, commissioning & startup for upgradation of old obsoleted excitation AVR for Turbine Generator and replacing with ABB UNITROL 1020 AVRDesign, engineering, supply, commissioning & startup for upgradation of old obsoleted excitation AVR for Turbine Generator and replacing with ABB UNITROL 1020 AVRDAKAHLIA SUGARDAKAHLIA SUGAR2015
Design, engineering, commissioning & startup for upgradation of old obsoleted excitation AVR for Qty:7 Turbine Generators and replacing with ABB UNITROL 1000 AVRDesign, engineering, commissioning & startup for upgradation of old obsoleted excitation AVR for Qty:7 Turbine Generators and replacing with ABB UNITROL 1000 AVRABB EGYPTESIIC | Egyptian Sugar Integrated Industries Co. / EGYPT2017 / 2018 / 2019